PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at at the top of the detention cells Facing North.jpg Laying out block at top of detention cells Facing North.jpg Installed duct work fitings at the 4th floor Facing North.jpg Installed temporary lighting at the 2nd floor Facing East.jpg Installing duct work fitings at the 4th floor Facing West.jpg Laying out block at the 1st floor bathrooms 133-136 Facing North.jpg Started insulating the duct work at the 2nd floor.jpg Welding the steel angle extensions at the South Elevation (2).jpg Welding the steel angle extensions at the South Elevation.jpg
Previous pageNext page Installing duct work fitings at the 4th floor Facing West
Installing duct work fitings at the 4th floor Facing West